Use a plans report to see the programming your coaches produce. Each row is one new client plan created in the period. Click How many hours did plans return to each coach? under Coaches, ask your own question, or switch Report on to Plans.
Steps
- Open Reports.
- Click How many hours did plans return to each coach?, or type a question such as “How many plans did each coach make last month?” and click Get answer.
- Check the Activity period phrase and change it if needed. It picks plans by the day they were created.
- To look at one coach, plan type or location, add a Coach, Plan type or Home location condition, or choose a location for the report.
- For plans per coach or per month, show A breakdown by Coach or Month created. For hours returned over time, show A chart over time.
- Click Run again.
Plan fields
- Coach: the coach who created the plan. A plan created by someone who isn’t a coach counts for the plan’s coach.
- Plan type: AI generated plans were written with Strix’s AI, even if a coach edited them afterwards. Built by hand plans were made in the editor without it.
- Minutes to produce: the time spent making the plan, measured from what Strix records as it happens: the plan being created, AI generation finishing and every save in the plan editor, during the plan’s first 7 days. A gap of more than 15 minutes between two of those counts as a break, not work. Nobody types this number in.
- Hours returned: the coach time saved compared with writing the plan by hand. Each AI generated plan is counted as 60 minutes of hand programming, minus its minutes to produce, never below zero. Built by hand plans return nothing.
Good to know
- These are the same plans Plans authored counts on coach reports. Templates, failed generations and copies of other plans, such as template assignments, weekly versions and forks, are left out.
- Plans for clients you’ve since marked inactive still count, because the work was done.
- Time before a plan exists isn’t measured, such as filling in the AI generation form. Edits after the first 7 days are ongoing programming, not production.
- Minutes to produce can only be averaged. Hours returned can be added up.
- Plan production is measured from records Strix already keeps, so reports cover plans made before this report was added. Strix has kept editor saves since April 2026, so for older plans only AI generation time is measured.
- The 60 minute baseline is an estimate of hand programming time that Strix applies to every gym. It isn’t set per gym.